Kern-sohn IEX 100K-1MEU User Manual

Browse online or download User Manual for Scales Kern-sohn IEX 100K-1MEU. KERN & SOHN IEX 100K-1MEU User Manual [es] [it] [en] [de]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 13
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
KERN & Sohn GmbH
Ziegelei 1
D-72336 Balingen
E-Mail: info@kern-sohn.com
Phone: +49-[0]7433- 9933-0
Fax: +49-[0]7433-9933-149
Internet: www.kern-sohn.com
Operating manual
Platform balance
KERN IEX
Version 1.2
10/2014
GB
Doc.No.IEX-BA-e-1412
Page view 0
1 2 3 4 5 6 ... 12 13

Summary of Contents

Page 1 - Platform balance

KERN & Sohn GmbH Ziegelei 1 D-72336 Balingen E-Mail: [email protected] Phone: +49-[0]7433- 9933-0 Fax: +49-[0]7433-9933-149 Internet: www.kern-

Page 2 - KERN IEX

• Put the weighing pan on the platform balance. • Position the adapter outside the hazardous area in which an explosive atmosphere may be expec

Page 3

• Connect the mains connection to the power supply of 230V AC. • For prolonged periods of inactivity disconnect the balance from the power supply

Page 4

7 Cleaning and maintenance • Unplug the mains plug from the power unit IEX-A01. • Check, whether the electrostatic earth connection is plugged in

Page 5 - Ex-protected area

8 Technical examination • Technical examination by expert staff is required every three months. The examination should include the following:

Page 6

GB KERN IEX Version 1.2 10/2014 Operating manual Platform balance Contents 1 Pay attention to the instructions in the Operation Manual ...

Page 7

1 Pay attention to the instructions in the Operation Manual Carefully read this operation manual before setup and commissioning, even if you are a

Page 8 - How to install the balance

2 Intended use of IEX scales Load in ex-protected spaces. It is possible to tare the balance over the entire working range, thus allowing determina

Page 9

Balance series IEX with display unit KEX-TM IEX (platform balance 300x300) IEX – (500x400) Safe area Ex-protected area 1 load cell balan

Page 10

4 ATEX marking – meaning of icon • IEX balances meet the requirements of group II, class 2 for devices in accordance with Directive 94/9/WE and

Page 11

• Ambient temperature during operation -10°C to +40°C. • The balance must be protected against mechanical shocks and vibrations. • The IEX bal

Page 12 - 7 Cleaning and maintenance

5 How to install the balance • Prepare the installation site for the IEX balance in a professional manner. • Ensure that the installation site is

Page 13 - 8 Technical examination

The diagram below shows the balance’s connection to earth: Place the platform balance and the display unit on the intended inst

Comments to this Manuals

No comments