KERN & Sohn GmbH Ziegelei 1 D-72336 Balingen E-Mail: [email protected] Phone: +49-[0]7433- 9933-0 Fax: +49-[0]7433-9933-149 Internet: www.kern-
• Put the weighing pan on the platform balance. • Position the adapter outside the hazardous area in which an explosive atmosphere may be expec
• Connect the mains connection to the power supply of 230V AC. • For prolonged periods of inactivity disconnect the balance from the power supply
7 Cleaning and maintenance • Unplug the mains plug from the power unit IEX-A01. • Check, whether the electrostatic earth connection is plugged in
8 Technical examination • Technical examination by expert staff is required every three months. The examination should include the following:
GB KERN IEX Version 1.2 10/2014 Operating manual Platform balance Contents 1 Pay attention to the instructions in the Operation Manual ...
1 Pay attention to the instructions in the Operation Manual Carefully read this operation manual before setup and commissioning, even if you are a
2 Intended use of IEX scales Load in ex-protected spaces. It is possible to tare the balance over the entire working range, thus allowing determina
Balance series IEX with display unit KEX-TM IEX (platform balance 300x300) IEX – (500x400) Safe area Ex-protected area 1 load cell balan
4 ATEX marking – meaning of icon • IEX balances meet the requirements of group II, class 2 for devices in accordance with Directive 94/9/WE and
• Ambient temperature during operation -10°C to +40°C. • The balance must be protected against mechanical shocks and vibrations. • The IEX bal
5 How to install the balance • Prepare the installation site for the IEX balance in a professional manner. • Ensure that the installation site is
The diagram below shows the balance’s connection to earth: Place the platform balance and the display unit on the intended inst
Comments to this Manuals