Kern-sohn BBN 3T-3M User Manual

Browse online or download User Manual for Scales Kern-sohn BBN 3T-3M. KERN & SOHN BBN 3T-3M User Manual [cs] [en] [de] [pl]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
KERN & Sohn GmbH
Ziegelei 1
D-72336 Balingen
E-Mail: info@kern-sohn.com
Phone: +49-[0]7433- 9933-0
Fax: +49-[0]7433-9933-149
Internet: www.kern-sohn.com
Installation instructions weighing bridge
KERN KFP V40
Version 1.2
10/2014
GB
KFP V40-IA-e-1412
Page view 0
1 2 3 4 5 6 ... 15 16

Summary of Contents

Page 1 - KERN KFP V40

KERN & Sohn GmbH Ziegelei 1 D-72336 Balingen E-Mail: [email protected] Phone: +49-[0]7433- 9933-0 Fax: +49-[0]7433-9933-149 Internet: www.kern-

Page 2

7.1 Operation limits • The weighing bridges are designed extremely robust. However the load limits according to the following table should not be e

Page 3 - 3 Basic instructions

8 Service, maintenance, disposal Before any maintenance, cleaning and repair work disconnect the appliance from the operating voltage. 8.1 Daily ch

Page 4

8.5 Instant help In case of an error in the program process, briefly turn off the balance and disconnect from power supply. The weighing process mus

Page 5 - 5 Transport and storage

9 Service documentation • This chapter is only intended for a balance specialist! • The weighing bridges are carried out in DMS sensor technology,

Page 6

9.2 Check and adjustment of the corner load Check of the corner load: • Place the test weights in the centre of the load plate and tare. • The

Page 7 - CAUTION

1. 2. 3. 4. Adjustment of weighing cell J2 takes place at the potentiometer VR1. Adjustment of weighing cell J3 takes place at the potentiometer

Page 8

10 Preload, Deadload and Overload settings Kern model Deadload** (kg) **= already applied preload Center Overload Protection circa (kg) Corner Ove

Page 9 - 7 Operation

GB KERN KFP V40 Version 1.2 10/2014 Installation instructions weighing bridge Contents 1 General ...

Page 10

1 General These installation instructions contain all data necessary for placing and commissioning the weighing bridge KERN KFP 1500V40M. 2 Technica

Page 11

3.4 Warranty Warranty claims shall be voided in case • Our conditions in the operation manual are ignored • The appliance is used outside the descr

Page 12

4 Basic Safety Precautions 4.1 Pay attention to the instructions in the Operation Manual Carefully read this operation manual before setup and com

Page 13 - 9 Service documentation

6 Unpacking, Setup and Commissioning 6.1 Installation Site, Location of Use The weighing bridges are designed in a way that reliable weighing result

Page 14

6.2 Unpacking, Scope of delivery CAUTION + Danger for the back! The weighing bridge is relatively heavy. Always use a suitable lifting device to li

Page 15

6.3 Assembly, levelling Accurate weighing results require a weighing bridge with perfect horizontal alignment. During initial installation and after

Page 16

6.4 Connecting a display unit Attention Put the connecting cable to the display unit in a manner that it is protected against damage. Description

Related models: BBN 1T-4M | BBN 1T-4SM | BBN 600K-1SM |

Comments to this Manuals

No comments